TVA Public Relations Staff Edited Engineer's Report on Failed Coal-Ash Dam
Dam inspections began before the Dec. 2008 spill incident of 5.4 million cubic yards of coal-ash slurry in Tennessee. Afterward, the initial draft engineer's report of the pre-spill inspection noted several eroded areas needed to be fixed "immediately;" the word was subsequently struck from the report.